RKC INSTRUMENT COM-JC Manuel d'instructions Page 87

  • Télécharger
  • Ajouter à mon manuel
  • Imprimer
  • Page
    / 106
  • Table des matières
  • DEPANNAGE
  • MARQUE LIVRES
  • Noté. / 5. Basé sur avis des utilisateurs
Vue de la page 86
IMR01Y06-E6 81
8. USAGE EXAMPLE
This chapter describes a usage example of CC-Link communication.
8.1 Handling Procedures
To avoid error at operation start-up, COM-JC must be powered on LAST (after the
Controller, PLC, etc.).
Preparations of
Configuration Instrument
Mounting and Wiring
Use Instruments Setting
Refer to 8.2 System Configuration (P. 82)
Refer to 5. SETTING (P. 16) and 8.3 Use Instruments
Setting (P. 83).
Device Assignments
Refer to 8.4 Device Assignments Example (P. 85).
Program Creation
Refer to 8.5 Sample Program (P. 88).
For cable wiring of CC-Link network system,
refer to Instruction Manual of master instrument or
website of CC-Link Partner Association.
http://www.cc-link.org/
For mounting and wiring of the COM-JC, refer to
3. MOUNTING (P. 5) and 4. WIRING (P. 8).
For mounting and wiring of the controller (FB400),
refer to FB400/FB900 Installation Manual
(IMR01W01-E).
For mounting and wiring of PLC, refer to PLC
Instruction Manual.
Vue de la page 86
1 2 ... 82 83 84 85 86 87 88 89 90 91 92 ... 105 106

Commentaires sur ces manuels

Pas de commentaire